EV chargers in Mexico: how to comply with CRE Agreement A/108

Free for up to 20 chargers · no EzGYM commission per session · no credit card

Step-by-step setup guides for 38 charger models: Wallbox, ABB, Huawei, Schneider, Zaptec, Easee and more. See guides by brand

CRE Agreement A/108/2024 (Official Gazette, September 10, 2024) requires anyone who charges for EV charging to publish location, connectors, charging points, mode, status, availability and prices, and to file the monthly minimum, average and maximum prices every January and July. EzGYM covers it with a public page for your stations with VAT-inclusive prices, the monthly price spreadsheet and an OCPP 1.6J and 2.0.1 server with OCPI. The CFDI invoice, the meter and the filings are on you.

This is not legal or tax advice. It is our reading of Agreement A/108/2024 as of November 27, 2026: check with your advisor what applies to you.

Who it applies to

  • Electrolineras: a space dedicated to charging electric vehicles where charging is paid (parking lots, hotels, malls, buildings that charge).
  • Electroterminales: charging for public transport, freight or private fleets.
  • Free charging stations on public roads.
  • It covers power supply requests filed from September 11, 2024. The CRE became the CNE in 2025 and its rules remain in force until new ones are issued.

What it requires and how EzGYM covers it

Requirement What EzGYM does What you do
Publish location, connectors, number of points, charging mode, status and availability Public page for your stations, with live status for each outlet, and the same data over OCPI Fill in each charger address and coordinates and turn publishing on
Publish payment method and prices (per kWh, time or period) on the web while the official platform is not running Prices per kWh, per time and a flat fee, VAT included on the public page Enter the tariff and VAT (16 %, or 8 % in the border region if it applies to you)
Appendix 2 (charging sites): monthly minimum, average and maximum prices, in January and July «Prices per month» spreadsheet per charger with the last 6 months File it with the authority through the current channel
Smart charger (CIVE): open OCPP and OCPI protocol and energy management OCPP 1.6J and 2.0.1, OCPI 2.3.0 and 2.2.1, and power limit per session or per charger Make sure the charger speaks OCPP: its datasheet says so
Show connectors, type, charging mode and instructions on each charger QR poster per outlet with the price per kWh, and the price on the display of 2.0.1 chargers that have one Put the label with the data the rules require on the charger

What the operator has to do (the software does not)

  • Issue the CFDI for each sale or the global invoice to the general public. EzGYM does not issue CFDI invoices.
  • Contract an independent power supply (its own CFE meter) for the charging infrastructure.
  • File Appendix 1 with the chargers characteristics within 3 months of receiving the supply.
  • File the energy resale notice (Agreement A/039/2018) within 6 months of starting to sell.
  • Gather the charger product certificate (or lab report), installation by certified staff (EC0118 or EC1023) and the advanced functions datasheet.

OCPP and OCPI «in their latest version»

The rules define a smart charger as one that manages energy with an open protocol (OCPP and OCPI) in its latest version. EzGYM speaks OCPP 1.6J, in production with real chargers, and OCPP 2.0.1, validated against the official schemas, and offers OCPI 2.3.0 and 2.2.1 to publish locations, availability and tariffs.

How to get publishing ready in EzGYM

  1. 1 Connect each charger to the free OCPP server (wss://charger.ezgym.net/<ChargeBoxID>).
  2. 2 Enter each charger tariff: price per kWh, per minute or a flat fee per session.
  3. 3 In OCPI and public page enter the operator name, the VAT and whether your prices include it, and turn on the public stations page.
  4. 4 On each charger page fill in address, city, state and coordinates and turn on «Publish this charger».
  5. 5 Link the public page from your website or app.
  6. 6 In January and July download «Prices per month» with the last 6 months for Appendix 2.

Frequently asked questions

Does EzGYM issue the CFDI for charging?

No. The operator issues the CFDI with its invoicing provider, with 16 % VAT (or 8 % in the border region with the incentive). EzGYM keeps the kWh and amount of each session so you can invoice it.

Is the official ElectroCRE platform running?

We found no confirmation that it is operating or that it has an API. In the meantime the rules ask you to publish on your website or app, and the channel for the appendices is the email the authority indicates.

Does my charger have to be OCPP 2.0.1?

The rules mention OCPP and OCPI in their latest version for a smart charger. Ask your advisor what they require from you. EzGYM accepts both 1.6J and 2.0.1.

Can I charge per kWh, per time or per session?

Yes, the rules allow charging per kWh, per time or per period, and the EzGYM tariff has those three parts.

How much does it cost?

The OCPP server, the public page and the price spreadsheet are free up to 20 chargers per account.

More OCPP guides

Guides by charger model

Checked on 2026-11-26 against the server code. Official OCPP reference (Open Charge Alliance).

Connect my charger for free